*Material and structural description of the entire machine:
① The frame adopts SUS304 # stainless steel square tube welding;
② The material contact part is made of 304 # stainless steel material;
③ The control cabinet and filling part are designed separately, making cleaning more convenient;
*Work flow: automatic cup feeding→fruit meat adding→quantitative filling→unwinding film→coding→electric eye detection→sealing I→electric eye correction→sealing II→shearing→collecting waste film→Cleaning template→withdrawing cup, the whole process is fully automated control.
Model | CFD-16(φ38) | CFD-20(φ38) | CFD-24(φ38) | CFD-28(φ38) |
Production rate | 15000-17000 cups/H | 19000-21000 cups/H | 23000-25000 cups/H | 27000-29000 cups/H |
Filling Volume | 20-100ml | |||
Machine Power | 3-phase 4-lines/380V/50/Hz | |||
Air Consumption | 0.8-1.0 m³/min 0.5-0.8Mpa | |||
Machine Dimension | 5500x850x1800mm(L x W x H) | 5500x1050x1800mm(L x W x H) | 5500x1120x1800mm(L x W x H) | 5500x1250x1850mm(L x W x H) |
*We can design new models according to users' needs.
1.What is the price of this device?
It depends on your company's technical requirements for the equipment, such as using domestic or foreign brands for related accessories, and whether other devices or production lines need to be matched. We will make accurate plans and quotations based on the product information and technical requirements you provide.
2.How long is the delivery time approximately?
The delivery time for a single device is generally 40 days, while large-scale production lines require 90 days or more; The delivery date is based on the confirmation of the order by both parties and the date we receive the deposit for your products and equipment. If your company requires us to deliver a few days in advance, we will do our best to meet your requirements and complete the delivery as soon as possible.
3. Payment method?
The specific remittance method shall be agreed upon by both parties. 40% deposit, 60% pick-up payment.