*Material and structural description of the entire machine:
① The frame adopts SUS304 # stainless steel square tube welding;
② The material contact part is made of 304 # stainless steel material;
③ The control cabinet and filling part are designed separately, making cleaning more convenient;
④ The equipment is equipped with a laminar flow purification hood to improve the cleanliness of filling;
⑤ Install a waste recycling tank below the rack;
⑥ Using brushed square tubes to make door frames+organic glass.
*Work flow: automatic feeding cup→automatic pressing cup→UV lamp sterilization→servo quantitative filling→automatic suction and discharge of single film→sealing I→sealing II→cold sealing III→mechanical top cup→reverse cup→mechanical top cup output, the whole process is fully automated control.
Model | CFD-4 | CFD-6 | CFD-8 | CFD-16 |
Production Rate | 3500-4500 cups/H | 5000-5600cups/H | 7000-7600 cups/H | 12000-13000 cups/H |
Filling Volume | 250-500g | 100-200g | 100-200g | 100-200g |
Machine Power | 3-phase 4-lines/380V/50/Hz | |||
Air Consumption | 0.8-1.0 m³/min 0.7-0.8Mpa | |||
Machine Dimension | 5200x850x2400mm (L x W x H) |
5200x1050x2400mm (L x W x H) |
5200x1250x2400mm (L x W x H) |
8000x1250x2400mm (L x W x H) |
*We can design new models according to users' needs.
1. What is the price of this device?
It depends on your company's technical requirements for the equipment, such as using domestic or foreign brands for related accessories, and whether other devices or production lines need to be matched. We will make accurate plans and quotations based on the product information and technical requirements you provide.
2. How long is the delivery time approximately?
The delivery time for a single device is generally 40 days, while large-scale production lines require 90 days or more; The delivery date is based on the confirmation of the order by both parties and the date we receive the deposit for your products and equipment. If your company requires us to deliver a few days in advance, we will do our best to meet your requirements and complete the delivery as soon as possible.
3. Payment method?
The specific remittance method shall be agreed upon by both parties. 40% deposit, 60% pick-up payment.