*Material and structural description of the entire machine:
① The frame adopts SUS304 # stainless steel square tube welding;
② The material contact part is made of 304 # stainless steel material;
③ The control cabinet and filling part are designed separately, making cleaning more convenient;
④ The rotating disc is made of aluminum alloy and wrapped with stainless sheet metal;
*Work flow: manual bag hanging→automatic quantitative filling→automatic nitrogen filling (blowing) →automatic cleaning suction nozzle→automatic cap sort out→automatic cap-falling→cap-falling detection→automatic cap-turning (using permanent magnetic force to control torque)→automatic bag withdrawing. Except for manual bag hanging, other processes are fully automatic control.
Model | CHXG-6A |
Production rate | 5500-6000 bags/H |
Filling Volume | 50-250ml |
Machine Power | 3-phase 4-lines/380V/50/Hz |
Air Consumption | 0.7 m³/min 0.5-0.8Mpa |
Machine Dimension | 2370x1690x2000mm(L x W x H) |
*We can design new models according to users' needs.
1. What is your delivery time?
Answer: Normally, our delivery time is within 40 days after the contract is confirmed and the deposit is received, while larger production lines require 60 to 90 days.
2. What services can we provide?
Accepted delivery terms. FOB,CIF,EXW;
Accepted payment currency. USD, RMB.
Accepted payment method. T/T;
Language English, Chinese
3. High quality. Use high-quality materials, establish a strict quality control system, and have dedicated personnel responsible for each production process.
4. We provide the best service because we have an experienced sales team already working for you.
1.What is the price of this device?
It depends on your company's technical requirements for the equipment, such as using domestic or foreign brands for related accessories, and whether other devices or production lines need to be matched. We will make accurate plans and quotations based on the product information and technical requirements you provide.
2.How long is the delivery time approximately?
The delivery time for a single device is generally 40 days, while large-scale production lines require 90 days or more; The delivery date is based on the confirmation of the order by both parties and the date we receive the deposit for your products and equipment. If your company requires us to deliver a few days in advance, we will do our best to meet your requirements and complete the delivery as soon as possible.
3. Payment method?
The specific remittance method shall be agreed upon by both parties. 40% deposit, 60% pick-up payment.