*Material and structural description of the entire machine:
①The machine adopts a stainless 304# appearance, and the carbon steel frame and some accessories are processed with acid and anti-corrosion treatment layers;
② The bag placement slot is convenient and simple, equipped with an automatic bag pressing device;
③ It can manually adjust the bag width and be equipped with different feeding systems, achieving multiple functions for one machine;
④ High degree of automation, simple operation, and stable mechanical transmission performance;
⑤ It can be equipped with various coding, spraying, exhaust, punching, discharge and conveying systems.
*Work flow: Manual placement the bag→suction of bags→coding→opening the bag→filling→ leveling of bag opening→sealing→finished products falling onto the conveyor,Fully automated control of the entire process.
Model | CHGD-210 |
Packaging bag type | Four side sealing bag、Three side sealing bag |
Production rate | 1800-3000 bags/H |
Filling Volume | 100-500g |
Machine Power | 3-phase 4-lines/380V/50/Hz |
Air Consumption | 0.7 m³/min 0.65-0.7Mpa |
Machine Dimension | 2140x1366x2500mm(L x W x H) |
*We can design new models according to users' needs.
1.What is the price of this device?
It depends on your company's technical requirements for the equipment, such as using domestic or foreign brands for related accessories, and whether other devices or production lines need to be matched. We will make accurate plans and quotations based on the product information and technical requirements you provide.
2.How long is the delivery time approximately?
The delivery time for a single device is generally 40 days, while large-scale production lines require 90 days or more; The delivery date is based on the confirmation of the order by both parties and the date we receive the deposit for your products and equipment. If your company requires us to deliver a few days in advance, we will do our best to meet your requirements and complete the delivery as soon as possible.
3. Payment method?
The specific remittance method shall be agreed upon by both parties. 40% deposit, 60% pick-up payment.